Confidential Bioresearch Facility Case Study
Home > Case Studies
Client Name:
Confidential Bioresearch Facility
Client Name:
Confidential Bioresearch Facility
Industry:
Biotechnology / Bioresearch
Industry:
Biotechnology / Bioresearch
Location:
Maryland
Location:
Maryland
The Challenge
A Maryland-based bioresearch facility totaling over 300,000 sq. ft. had experienced multiple lab expansions over several years, ultimately outgrowing the capacity of their current RODI (Reverse Osmosis/Deionization) water system. The only solution they were aware of involved a costly and complex reconfiguration of the mechanical room to accommodate a larger system footprint posing financial, logistical, and operational challenges.
Solution Implemented
Neu-Ion was brought in based on a history of successful consultations and installations. Instead of simply enlarging the existing system, Neu-Ion designed a custom-engineered upgrade that increased RODI capacity, reduced the overall equipment footprint in the mechanical room, and lowered annual operational costs. This thoughtful and innovative approach eliminated the need for costly infrastructure changes.
Implementation Highlights
Neu-Ion completed the system installation over a single weekend to ensure zero downtime and uninterrupted lab research operations. The planning, coordination, and execution demonstrated a deep understanding of the facility’s operational needs and constraints.
The Results
- Increased RODI system capacity to meet expanded lab demand.
- Decreased mechanical room footprint.
- Reduced operational costs.
- Maintained uninterrupted research activities during transition.
- Reinforced trust in Neu-Ion’s ability to deliver tailored, cost-effective solutions.
